Baanboard.com

Go Back   Baanboard.com

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
35%
Installation Wizard into new VRC
42%
Manual into existing VRC
3%
Manual into new VRC
19%
Total votes: 31

Baanboard at LinkedIn


Reference Content

 
Ramaswamy's blog
Cancellation of a Production order(fully not delivered)
By Ramaswamy at 7 Feb 2010 - 09:44

We have migrated from BaaN IVc to LN recently.

We are not able to Cancel any Production orders where full quantity of that Itm code is not delivered.But the Inventory as per estimated materials were released either fully or partially.We  reversed the issued materials by negative entry and thus ensured that all estimated materials to be reelased.

 In BaaN we were able to cancel the Production orders but in LN even after reversing the material issues,we are not able to cancel the Production orders.

Request solution from Experts how to proceed in Cancellation.

 

Ramaswamy

 

 


Estimated materials - Shop floor control
By Ramaswamy at 18 Jan 2010 - 10:38

In LN ''The estimated materials" is frozen when the Production orders becomes 'Active' status and does not allow any items to add or delete in this status.

Our requirement is we should be able to add or delete some items in Estimated materials of any Production orders in 'Active' status also.Where we have to set the Parameters to enable this option.

Request the manufacturing consultants to give the solution for this.

 

regards

Ramaswamy

Baan board member

 

 



All times are GMT +2. The time now is 00:10.


©2001-2017 - Baanboard.com - Baanforums.com