Baanboard.com

Go Back   Baanboard.com > Forum > CMS - Forum Integration > Jobs and Resumes

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
37%
Installation Wizard into new VRC
39%
Manual into existing VRC
3%
Manual into new VRC
21%
Total votes: 38

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 13th October 2017, 00:04
Keylent Keylent is offline
Junior Member
 
Join Date: Apr 2017
Posts: 15
Keylent is on a distinguished road
Baan: Baan4 - DB: mysql - OS: windows
BPCS LX with Manufacturing

A new job entry has been added:

BPCS LX with Manufacturing

Quote:
Upgrade from BPCS 4.05 CD to LX 8.3.5
Advanced Process Industries
Capacity Planning
Configuration Management
JIT/Repetitive Manufacturing
Manufacturing Data Management
Master Production Scheduling
Material Requirements Planning
Engineering Change Management
Quality Management
Shop Floor Control
Reply With Quote
Sponsored Links
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Baan Functional (Manufacturing, Distribution and Finance) ERP Consultant / Analyst TriNET Jobs Jobs and Resumes 0 17th July 2008 19:20
PERSBERICHT: Hiab Manufacturing BV implementeert Infor ERP LN mcroonen Nederlandstalig forum 0 29th January 2007 21:59
I need a Manufacturing Business Analyst hamidforouzi Jobs and Resumes 1 21st January 2002 00:49


All times are GMT +2. The time now is 01:53.


©2001-2017 - Baanboard.com - Baanforums.com