Go Back > Forum > CMS - Forum Integration > Blogs and Web links

User login

Frontpage Sponsor


Google search

For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
Installation Wizard into new VRC
Manual into existing VRC
Manual into new VRC
Total votes: 39

Baanboard at LinkedIn

Reference Content

Thread Tools Display Modes
Old 20th November 2016, 19:15
ravikunte ravikunte is offline
Join Date: Nov 2016
Posts: 1
ravikunte is on a distinguished road
Baan: BAAN IV - DB: Baan IV - OS: Windows 8
Production order status change from Complet to Active status

A new blog entry has been added:

Production order status change from Complet to Active status

I want to reset prodution order status from Completed stage to active please share session code for the same
Reply With Quote
Old 12th December 2016, 13:08
sasikanth's Avatar
sasikanth sasikanth is offline
Senior Member
Join Date: Jul 2009
Location: Hyderabad, Andhra Pradesh, India
Posts: 150
sasikanth is on a distinguished road
Baan: L.N 6.1 FP7, 10.3, 10.4 & 10.5 - DB: SQL Server - OS: Windows

Which version of LN you are using?
Sasi Kanth V
Infor ERP LN Solution Architect

Reach Me Out on LinkedIn | Never Miss an Update from LN Campus YouTube Channel
Reply With Quote
Sponsored Links

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Production Order Status LittleJohn Manufacturing & Supply Chain 5 20th July 2006 09:21
Problem: Push production order from "To be completed" to "Complete". mostrightfuture Manufacturing & Supply Chain 3 27th April 2006 05:33
Impact on finance integration when Production Order status re-set Tauhaina Finance, Invoicing and Integration 0 30th May 2005 06:01
Is possible to change Production order status Senthil Manufacturing & Supply Chain 1 27th September 2004 12:41
Production Order Complete tomlbacon Manufacturing & Supply Chain 3 16th June 2004 14:06

All times are GMT +2. The time now is 09:54.

©2001-2017 - -