Baanboard.com

Go Back   Baanboard.com > Forum > Baan Quick Support: Functional & Technical > Distribution, Transportation & Warehousing

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
35%
Installation Wizard into new VRC
42%
Manual into existing VRC
3%
Manual into new VRC
19%
Total votes: 31

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 9th November 2015, 16:17
r_nagu's Avatar
r_nagu r_nagu is offline
Senior Member
 
Join Date: Mar 2002
Location: ~
Posts: 231
r_nagu is on a distinguished road
Baan: BaaN IV - DB: Oracle 8 - OS: UNIX
WIP warehouse
Baan: Other/Unknown

Baan version: BaaN IV

Dear all,

We are trying to setup a warehouse (mainly used to supply production orders) that is Nettable, use DRP to replenish that warehouse and also have the system plan for some level safety stock in that warehouse.

I understand that warehouse of type WIP and Nettable will allow us to use DRP to replenish WIP warehouse from the main warehouse.

But, if we maintain min/max quantities by Item/warehouse (for the WIP warehouse), though DRP generates a DRP RPL order, MRP does not generate any recommendations (MRP purchase orders for example) if there is a shortage of inventory in the main warehouse because WIP warehouse being Nettable.

Any ideas how we can maintain a safety stock in WIP warehouse?

Appreciate any advice/recommendations.

Thanks
NS
Reply With Quote
  #2  
Old 10th November 2015, 08:08
erplncons erplncons is offline
Member
 
Join Date: Oct 2008
Posts: 86
erplncons is on a distinguished road
Baan: All - DB: All - OS: All
You need to make the WIP warehouse as non-nettable. Also unless the planned production orders are printed and released, their allocation does not shift to the WIP warehouse (from default warehouse as mentioned in the BOM).
Reply With Quote
Sponsored Links
  #3  
Old 10th November 2015, 16:29
r_nagu's Avatar
r_nagu r_nagu is offline
Senior Member
 
Join Date: Mar 2002
Location: ~
Posts: 231
r_nagu is on a distinguished road
Baan: BaaN IV - DB: Oracle 8 - OS: UNIX
Thanks for response.

Unfortunately, making the WIP warehouse non-nettable is not an option at this point.

NS
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
How to define WIP issue warehouse for a BOM to populate for Prod. order? baanfin Manufacturing & Supply Chain 1 26th October 2012 17:29
WIP: Using WIP Warehouses and issuing material lordofe Distribution, Transportation & Warehousing 4 21st July 2005 14:25
inventory getting blocked in WIP warehouse vicky_09 Distribution, Transportation & Warehousing 5 18th March 2005 11:39
PRP Warehouse (Project to Project) sweber Finance, Invoicing and Integration 7 15th June 2004 17:16
Normal warehouse change to WIP warehouse lsatenstein Distribution, Transportation & Warehousing 3 6th September 2002 18:14


All times are GMT +2. The time now is 08:40.


©2001-2017 - Baanboard.com - Baanforums.com