  #1  
Old 5th March 2010, 06:12
abby13 abby13 is offline
Senior Member
 
Join Date: Jan 2007
Posts: 113
abby13 is on a distinguished road
Baan: baan 4 - DB: oracle - OS: unix
MPS production plan
Baan: Other/Unknown

Hi All,

For a particular actual scanario that has been initialized, we have a plan item which has a sales order of 200 pcs existing. When i put a forecast of 300 for that period and run the item master plan it is expected that it should create a production plan for 300-200=100 qty. However it does not create a production plan. in the plan items session (Master Plan tab), the Production pan is set to 'Always update'.

Is there any additional setting for the production plan to be updated?


Regards

Abhijit.
Reply With Quote
  #2  
Old 5th March 2010, 11:31
rohit_367's Avatar
rohit_367 rohit_367 is offline
Junior Member
 
Join Date: Aug 2008
Posts: 27
rohit_367 is on a distinguished road
Baan: Baan 4c, ERP Ln - DB: ORACLE - OS: WINDOWS XP
Hi Abhijit,
First of all Production Plan will be of 300 units considering there is no inventory of your item
Check Master planning tick box in Item Planning is set to Yes,
Check forcasted date should lie in Master Planning Horizon.
Run the Generate Master Planning with options Yes
It should work then.
Reply With Quote
Sponsored Links
  #3  
Old 8th March 2010, 17:21
avpatil avpatil is offline
Guru
 
Join Date: Feb 2002
Posts: 710
avpatil is on a distinguished road
Baan: IVc3 - DB: SQL2000 - OS: Win 2003
Hi,
The most common mistake happens when system doesn't create scheduled receipt is- No time fence in Plan item data or may be no time fence multiplier.
Check out both of them.
Arvind PAtil
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Production plan ?!? flysurfing Manufacturing & Supply Chain 4 24th November 2010 07:26
MPS Parameter Actual Plan Code jasperuk Manufacturing & Supply Chain 1 26th February 2009 18:24
MPS generating plan purchase order with qty 1 every day metbaan Manufacturing & Supply Chain 7 29th January 2008 17:43
MPS questions, food manufacturer Michail Manufacturing & Supply Chain 2 27th September 2004 15:05