  #1  
Old 18th January 2010, 10:38
Ramaswamy Ramaswamy is offline
Newbie
 
Join Date: Jan 2010
Posts: 2
Ramaswamy is on a distinguished road
Baan: LN - DB: Baan - OS: Windows
Estimated materials - Shop floor control

A new blog entry has been added:

Estimated materials - Shop floor control

Quote:
In LN ''The estimated materials" is frozen when the Production orders becomes 'Active' status and does not allow any items to add or delete in this status.
Our requirement is we should be able to add or delete some items in Estimated materials of any Production orders in 'Active' status also.Where we have to set the Parameters to enable this option.
Request the manufacturing consultants to give the solution for this.

regards
Ramaswamy
Baan board member
Reply With Quote
Sponsored Links
  #2  
Old 21st January 2010, 09:44
Kiran Gholap Kiran Gholap is offline
Junior Member
 
Join Date: Jan 2008
Location: Mumbai
Posts: 23
Kiran Gholap is on a distinguished road
Baan: ERP LN 6.1 - DB: MS SQL - OS: Windows Server 2003
Once Estimated Materials get frozen then these can not be modified, however modification as required is possible through session "Material to Issue for Production Orders" ticst0101m100. But these modifications will not get reflected in estimiated materials costs because it has already got frozen based on value of "Moment Freezing Estimates" field maintained in "Default Production Order Data" session tisfc0502m000
Reply With Quote
  #3  
Old 21st January 2010, 21:48
saikatpaik's Avatar
saikatpaik saikatpaik is offline
Member
 
Join Date: Jan 2003
Location: USA
Posts: 52
saikatpaik is on a distinguished road
Baan: Baan IV, BaaN V, ERP LN 6.1 - DB: Oracle - OS: Unix
It's not possible to change the estimated materials after the Production Order has got the status Released. Status "Active" means Production process has already started and some of the operation in the routing already completed.

For your further info, you can execute Reprocess Production Order - tisfc1203m000. This will automatically include changes that are made in basic data such as BOM and routing. The session regenerates the production orders by deleting the existing production order data and hence the BOM and routing data for the new Reference Date are used.

You can only use this session for production orders whose status is:
Planned
Scheduled
Documents Printed.


Thanks
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Estimated VS Actual qty san1997 Manufacturing & Supply Chain 2 20th June 2009 08:22
Estimated Materials cherokee Manufacturing & Supply Chain 5 27th April 2006 07:03
Script for Comparison of Customized BOM and Estimated Materials jholdrid Tools Development 2 9th August 2004 21:38
Blocking of Enter Estimated Materials sathasivan Manufacturing & Supply Chain 3 22nd July 2002 15:23
Displaying phantoms on the Materials List report David A. Green Tools Development 4 20th February 2002 09:27


All times are GMT +2. The time now is 11:16.


©2001-2017 - Baanboard.com - Baanforums.com