Go Back > Forum > CMS - Forum Integration > Blogs and Web links

User login

Frontpage Sponsor


Google search

For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
Installation Wizard into new VRC
Manual into existing VRC
Manual into new VRC
Total votes: 39

Baanboard at LinkedIn

Reference Content

Thread Tools Display Modes
Old 28th May 2009, 17:05
Hitesh Shah's Avatar
Hitesh Shah Hitesh Shah is offline
Join Date: Nov 2001
Location: Mumbai,India
Posts: 1,855
Hitesh Shah is on a distinguished road
Baan: triton,Baan IVc4 , ERP Ln - DB: Oracle/Bisam/SQL 2000/SQL 2005 - OS: Sun Solaris/Windows 2003
Scheduling and drafting email for Baan Report / Excel Analysis

A new blog entry has been added:

Scheduling and drafting email for Baan Report / Excel Analysis

Scheduling emails of Analyses and Reports in Baan

It’s very important to be able to schedule the reports / analyses in Baan and email the same to the user in a meaningfully crafted message. This enables system to PUSH the intelligence and rather than requiring users to PULL the same.
Scheduling for Unequal periods and numeric periods

In Baan, Job management is the instrument of task / process scheduling. The same can be useful for scheduling report also. However there are following problems.
Reply With Quote
Sponsored Links

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

All times are GMT +2. The time now is 11:16.

©2001-2017 - -