Baanboard.com

Go Back   Baanboard.com > Forum > CMS - Forum Integration > Blogs and Web links

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
35%
Installation Wizard into new VRC
42%
Manual into existing VRC
3%
Manual into new VRC
19%
Total votes: 31

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 28th May 2009, 16:05
Hitesh Shah's Avatar
Hitesh Shah Hitesh Shah is offline
Guru
 
Join Date: Nov 2001
Location: Mumbai,India
Posts: 1,855
Hitesh Shah is on a distinguished road
Baan: triton,Baan IVc4 , ERP Ln - DB: Oracle/Bisam/SQL 2000/SQL 2005 - OS: Sun Solaris/Windows 2003
Scheduling and drafting email for Baan Report / Excel Analysis

A new blog entry has been added:

Scheduling and drafting email for Baan Report / Excel Analysis

Quote:
Scheduling emails of Analyses and Reports in Baan


 
It’s very important to be able to schedule the reports / analyses in Baan and email the same to the user in a meaningfully crafted message. This enables system to PUSH the intelligence and rather than requiring users to PULL the same.
Scheduling for Unequal periods and numeric periods

In Baan, Job management is the instrument of task / process scheduling. The same can be useful for scheduling report also. However there are following problems.
Reply With Quote
Sponsored Links
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +2. The time now is 13:58.


©2001-2017 - Baanboard.com - Baanforums.com