Baanboard.com

Go Back   Baanboard.com > Forum > General Topics > General Discussion & Chat

User login

Frontpage Sponsor

Main

Poll
Does your use of MS-SharePoint requires interface with your ERP system?
We do not use MS-SharePoint
46%
We do not have a need for an interface between SharePoint and ERP
18%
We need to insert or update data in SharePoint from the ERP
11%
We need to access SharePoint data from the ERP
1%
We need to access and insert data to SharePoint from the ERP
12%
We already have a third party tool to create the interface between SharePoint and ERP
8%
Other - Please Comment
4%
Total votes: 83

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 29th April 2008, 12:49
Navin Tenani Navin Tenani is offline
Senior Member
 
Join Date: Oct 2003
Posts: 133
Navin Tenani is on a distinguished road
Baan: BaanIVc4, ERP Ln 6.1 - DB: sql2k - OS: win2k
Implementation Project Plan

Hi,

Can anybody share with me the Project plan for ERP Implementation.

Regards

Navin Tenani
Reply With Quote
  #2  
Old 2nd May 2008, 06:55
jksharma jksharma is offline
Junior Member
 
Join Date: Dec 2006
Posts: 24
jksharma is on a distinguished road
Baan: BaaN IV C4 IS5 - DB: SQL,ORACLE - OS: Windows 2003
Hi Navin

The following Steps involved in ERP implementation

1. Pre - evaluation and screening
2. Packagae Evaluation
3. Project Planning Phase
4. Gap Analysis
5. Re-engineering
6. Configuration
7. Implementation team training
8. Testing
9. Go to Live
10. End User Training
11. Post Implementation Support.

The most important is after going live i.e. retaintion of existing trained employee in same company.

J K Sharma
Reply With Quote
  #3  
Old 2nd May 2008, 08:52
Navin Tenani Navin Tenani is offline
Senior Member
 
Join Date: Oct 2003
Posts: 133
Navin Tenani is on a distinguished road
Baan: BaanIVc4, ERP Ln 6.1 - DB: sql2k - OS: win2k
Hi

Hi JKS,

Thanks for your advise. Do you have any project plan available with you and can you share the same with me if its not that confidential.

Rgds

Navin
Reply With Quote
Sponsored Links
  #4  
Old 2nd May 2008, 11:47
jksharma jksharma is offline
Junior Member
 
Join Date: Dec 2006
Posts: 24
jksharma is on a distinguished road
Baan: BaaN IV C4 IS5 - DB: SQL,ORACLE - OS: Windows 2003
Hi Nitin

First of all I have to understand that what do you mean by "project plan" pertaining to ERP implementation as per my knowledge we have have to make a documented "AS IS" flow of industry, in which all work process must be maped including all type of reports which we are generating in daily, monthly or yearly. That is called Business Process after that we will match existing with ERP. This is a huge excercise not a small thing, it's require a complete team from all area lying at your end. They will make a detailed document in which all the working to related area will be documented. In this process so many things will come out which required reenginnering, may be some of the activity not required of some thing to be done like that. So, I think any ready made project will not solve your purpose. Apart from that for example purpose if you required any base document that I can give you. If still you want a ready made "AS IS Flow document" you can mail me on my personal id jk.sharma@kanoriachem.com

Regards,

J K Sharma
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Baan LN Consultants tonyking Jobs and Resumes 4 7th November 2006 21:15
Open Plan Resource Scheduling integrated with Baan Ulrich Hofmann Third Party Products 9 29th September 2005 17:46
Implementation Consultant / Project Manager addecker Jobs and Resumes 1 7th May 2005 07:06
PRP Warehouse (Project to Project) sweber Finance, Invoicing and Integration 7 15th June 2004 18:16
Texas Consultants Clark0429 Jobs and Resumes 0 9th February 2002 22:44


All times are GMT +2. The time now is 15:22.


©2001-2013 - Baanboard.com - Baanforums.com