Baanboard.com

Go Back   Baanboard.com > Forum > Baan Quick Support: Functional & Technical > Manufacturing & Supply Chain

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
37%
Installation Wizard into new VRC
39%
Manual into existing VRC
3%
Manual into new VRC
21%
Total votes: 38

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 23rd August 2005, 17:08
alvinh alvinh is offline
Junior Member
 
Join Date: Apr 2005
Posts: 3
alvinh is on a distinguished road
Baan: baan IV - DB: Oracle - OS: unix
Question breakdown of cost components in a customized multi-level BOM

We are currently using Baan IV c2 and the issue that we are having is finding out the real material, labor and overhead cost of the saleable item code.

When a standard item had a multi level BOM, the costs passed into the parent item come as both opetation and material costs. However, in a multi-level BOM on a customized item, all lower level component costs come in the parent item as material costs.

Is there any enhancement in IV c2 to solve this issue? Any suggestions? work arounds?
Reply With Quote
  #2  
Old 24th August 2005, 08:02
tjbyfield's Avatar
tjbyfield tjbyfield is offline
Guru
 
Join Date: Jun 2002
Location: Sydney Australia
Posts: 356
tjbyfield is on a distinguished road
Baan: baan4c4 - DB: oracle 805 - OS: AIX 4.3.3
Cost components by item

Have you seen table ticpr300 (Stanbdard Cost Price by Item) This table has each of the cost compnents appropriate for an item. These may include: several material components, labour, machine and other overhead components, surcharges etc, for the level you are looking at. ie: if the top level then this is the total cost.

Terry
Reply With Quote
Sponsored Links
  #3  
Old 30th August 2005, 15:44
ulrich.fuchs's Avatar
ulrich.fuchs ulrich.fuchs is offline
Guru
 
Join Date: Aug 2001
Location: Germany
Posts: 514
ulrich.fuchs is on a distinguished road
Baan: IV, LN6.1 - DB: --- - OS: ---
This is a major shortcoming of the Baan IV standard. The detailed information contained in the standard cost price structure of standard items (concerning material and operation costs) gets lost as soon as this item enters a project. There is no work-around in the standard.

However, I have realized a customization implemented for two customers of mine. However, major sessions have to be changed (mainly the project cost price calculation sessions), to not use cost price component of a standard item, but a more detailed information instead. If it's feasable and how long such a customization would take, depends on your situation (depth of BOMs, number of orders and so on.), because e.g. the number of integration postings will increase.

If you are interested, you might contact me using the data given below.

best regards,
Ulrich Fuchs
__________________

Dipl. Ing. Ulrich Fuchs
- ERP consulting and software development -
Widumestra├če 18 - 44787 Bochum - Germany
mail@ulrich-fuchs.de - www.ulrich-fuchs.de
http://all-in-for-erp.com (Blog zu Infor LN))
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Multi Level BOM das_k_tushar Manufacturing & Supply Chain 3 27th May 2005 03:39
5.0c -> Cost price calculation for customized items in pcs-project Andreas Manufacturing & Supply Chain 1 21st September 2004 09:05
Bom cost k_p_sm Manufacturing & Supply Chain 5 17th May 2004 15:00
Add labor without new BOM level jim s Manufacturing & Supply Chain 3 28th October 2002 19:21
BOM level vavs123 Manufacturing & Supply Chain 2 24th October 2002 17:41


All times are GMT +2. The time now is 07:57.


©2001-2017 - Baanboard.com - Baanforums.com