Baanboard.com

Go Back   Baanboard.com > Forum > Baan Quick Support: Functional & Technical > Manufacturing & Supply Chain

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
37%
Installation Wizard into new VRC
39%
Manual into existing VRC
3%
Manual into new VRC
21%
Total votes: 38

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 31st March 2005, 16:50
Dudutal97 Dudutal97 is offline
Junior Member
 
Join Date: Jan 2005
Posts: 7
Dudutal97 is on a distinguished road
Baan: IV - DB: Informix - OS: Windows 2000
Customized routing

We are using PCS (Project control) module.
We maintain the standard routing and we copy the standard routing to the customized item in the Project engineeting module (copy standard product structure to projet, tipcs2230m000).

In the standard routing we often open several codes for one item.
The problem is that when maintaining production orders for those items (in the shop floor control tisfc0101m000 maintain production orders), if the project field is filled with data there is no option to choose a routing code.

I guess that when using a opening a production order with a project, the routing is taken from the customized routing.
Is there a way to use several routing codes for the customized routing (item)?
Reply With Quote
  #2  
Old 31st March 2005, 18:59
Judy Miller Judy Miller is offline
Member
 
Join Date: Sep 2004
Posts: 78
Judy Miller is on a distinguished road
Baan: Baan IV - OS: SQL
Customized Routing

No there is not. A project assumes that you create the routing, custom for that item on that project. That is just the nature of projects. You will notice that project routings also do not have effective and expiry dates. It assumes that the routing is for the duration of the project.
__________________
Judy Miller
Senior Consultant
CrossroadsRMC
Reply With Quote
Sponsored Links
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Call a customized session form Standard Session das_k_tushar Tools Development 20 2nd September 2004 17:11
Baan V : Where is Customized Routing BigJohn Manufacturing & Supply Chain 3 15th April 2004 15:22
Production Routing hendra Manufacturing & Supply Chain 4 3rd April 2004 00:45
Pass values from standard session to a customized session !!! learner Tools Development 3 16th May 2003 22:07
Routing unit and fixed duration time Andreas Manufacturing & Supply Chain 1 25th March 2003 03:02


All times are GMT +2. The time now is 13:03.


©2001-2017 - Baanboard.com - Baanforums.com