  #1  
Old 13th December 2003, 01:02
jpadilla jpadilla is offline
Senior Member
 
Join Date: Jun 2002
Location: Mexico
Posts: 163
jpadilla is on a distinguished road
Baan: IVc4 - DB: Informix - OS: AIX
add some Production order to a project

Hi,

We are using the small project module, I have the next situation..

There is a project where an standard item was damaged, so I need to produce a new one, but I want that the cost of this new production Order be added to the project.

how can I add this production order to a project if the item is a standard item?? is mandatory to make it customized?? how would be the best way to do it??

Thanks

Regards..

JP
Reply With Quote
  #2  
Old 18th December 2003, 23:32
LittleJohn's Avatar
LittleJohn LittleJohn is offline
Senior Member
 
Join Date: Oct 2001
Location: CA
Posts: 184
LittleJohn is on a distinguished road
Baan: Baan4c2, Baan Vc - DB: SQL 2000, 7.0 - OS: Win 2003, Win2K Adv Server
I presume that your standard item is a lower-level item in the BOM of the Customized end-item. If so, are you trying to manufacture the standard item and then use it as a sub-assembly for the higher customized end-item OR is the standard item a purchased one?

you can create a re-work production order for the items that you have scrapped and the costs are carried over.
If you want the rework cost of the manufactured standard item to be absorbed as part of the project, then its better to transfer that as a customized item in your project and do a cost transfer.
Reply With Quote
Sponsored Links
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Sales Order to Production Order hexagenia Manufacturing & Supply Chain 6 3rd April 2003 06:57
Cancelling a Production order Rozlynn Smith Archiving & Multisite 3 17th March 2003 18:31
Generate Project Structure from sls order sturla Manufacturing & Supply Chain 1 5th December 2001 12:16


All times are GMT +2. The time now is 04:06.


©2001-2017 - Baanboard.com - Baanforums.com