For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
Installation Wizard into new VRC
Manual into existing VRC
Manual into new VRC
Total votes: 39

Baanboard at LinkedIn

Reference Content

Thread Tools Display Modes
Old 12th November 2003, 11:50
ulrich.fuchs's Avatar
ulrich.fuchs ulrich.fuchs is offline
Join Date: Aug 2001
Location: Germany
Posts: 514
ulrich.fuchs is on a distinguished road
Baan: IV, LN6.1 - DB: --- - OS: ---
Question Operation Costs by Work Center and Item group

I have a customer who want's to implement a particular method for setting up it's operation costs: Since the customer has about 10 lines of business, he want's to have operation rates by lines of business. So, operation A would have other cost when used in a routing of an item of business line 1 than when used in a routing of line of business 2.

The business lines map to to the baan item groups.

There are about ten business lines and about 70 different operations, which all should have there seperate costs; so we are talking about 700 different records.

We cannot use the operation surcharges by item group, since then we would need to have a seperate cost price component for each operation, which would make the integration tables explode.

The only thing I can think of right now is setting up different operation codes for each line of business (Drilling at Machine A-Line of Business 1, Drilling at Machine B-Line of Business 2...), and use those codes in the rountings with respect to the item group (line of business) the item belongs to. But then we need 700 operation codes, 700 operation rate codes and so on, which really get's messy and hard to explain to the end users.

Has anyone already had a similar problem or a better way to solve this issue?


Dipl. Ing. Ulrich Fuchs
- ERP consulting and software development -
Widumestra├če 18 - 44787 Bochum - Germany - (Blog zu Infor LN))
Reply With Quote
Old 12th November 2003, 12:10
Flip_J's Avatar
Flip_J Flip_J is offline
Join Date: May 2002
Location: South Africa
Posts: 435
Flip_J is on a distinguished road
Baan: All - DB: - - OS: -
I think the requirement needs to be looked at. A task performed by a person will cost the company the same no matter what product line you are looking at.
It seems that your customer is trying to solve a problem they have and came up with this solution. It might be better to look at the reason for this solution. What are they trying to achive by this?
Reply With Quote
Sponsored Links

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Subcontracting pbarbosa Manufacturing & Supply Chain 19 6th September 2002 07:07
Work center & calendar setup issue Bryan Manufacturing & Supply Chain 1 28th June 2002 10:51

All times are GMT +2. The time now is 21:28.

©2001-2017 - -