  #1  
Old 30th June 2003, 23:27
Bryan Bryan is offline
Member
 
Join Date: Nov 2001
Posts: 80
Bryan is on a distinguished road
Baan: 50.b - DB: Oracle - OS: Unix
Setup / Changeover Issue

Lets say we make three items, A, B, and C.

When we run the items in the following sequence, we have the following setup/chnageover times:

A, B, C
setup for A = 1 hour
setup for B = 2 hours
setup for C = 1 hour

C, B, A
setup for A = 30 minutes
setup for B = 6 hours
setup for C = 2 hours


How do we account for this in the routers in terms of both cost and planning? The setup time depends on the combination of what is run and when it is run, so I cannot put a single time into the router. I need to ba able to capture the costs, and to add this into the lead time for planning purposes
Reply With Quote
  #2  
Old 1st July 2003, 14:31
Eddy G Eddy G is offline
Member
 
Join Date: Jul 2002
Location: Holland
Posts: 77
Eddy G is on a distinguished road
Baan: BaanERP -
Bryan,

On what version are you?
This is information from BaanERP 5.0c: see below.

Regards - Eddy

Backgrounds on setup classes and setup states in iBaan ERP and BaanSCS
An important means to save time during production is to cut down on setup times. The benefits of saving setup times during production can be enormous. Moreover, saving setup times as much as possible reflects the situation on the shop floor in reality. Setup classes and setup states are used in iBaan ERP and BaanSCS to achieve a cutdown on setup times.
Example
If you want to spray-paint an item green during a specific operation, you must set up the required machine, which takes some time. If you subsequently use the same operation to spray-paint an item red, the machine must be set up again for the red paint. To reduce setup times, you can best schedule successively all production orders in which items are spray-painted red . The orders that involve green items can also be scheduled successively.
Moreover, to set up a machine from using green paint to using red paint could cost more time than a machine’s changeover from red to green. In this example it means that you can better first process the red orders, after which you can process the green orders.
Setup times in BaanSCS

BaanSCS Scheduler and BaanSCS Planner offer the possibility to define setup optimization rules. These rules allow you to limit setup times when scheduling production orders. For this purpose, BaanSCS uses a matrix (time in minutes).
Color: TO
Green Red White
FROM Green 0 100 100
Red 90 0 100
White 80 50 0

According to this matrix, it takes 100 minutes to set up a machine from red to white. To set up a machine from white to red costs 50 minutes.
In BaanSCS, the subject of the matrix equals the setup class. In this case, the setup class is color. Furthermore, a setup class consists of setup states. The setup states of the setup class are green, red, and white.
Reply With Quote
  #3  
Old 1st July 2003, 17:14
Bryan Bryan is offline
Member
 
Join Date: Nov 2001
Posts: 80
Bryan is on a distinguished road
Baan: 50.b - DB: Oracle - OS: Unix
Reply

very interesting, thanks for that input.

Unfortunately, we are on baan5.0b (hoping to move to 5c in the next 6 months)
Reply With Quote
  #4  
Old 4th July 2003, 07:29
hendra's Avatar
hendra hendra is offline
Senior Member
 
Join Date: May 2003
Location: Australia
Posts: 132
hendra is on a distinguished road
Baan: BaaN ERP, SSA ERP LN 6.1 - DB: SQL 2000, Oracle 9.2 - OS: W2KAS
Setup / Changeover Issue

If you're on BaaN ERP only, that kind of detailed setup cannot be handled. You're gonna need BaaN SCS (Scheduler)

BaaN Information (from Eddy) is a SCS Scheduler feature.
Reply With Quote
Sponsored Links
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Issue stock in service orders gokove Project & Services 4 14th April 2004 16:53
Printer Driver Setup Issue..need help RAMSBaan Tools Administration & Installation 3 28th March 2003 22:24
bilateral invoicing setup tritonian Finance, Invoicing and Integration 0 10th December 2002 19:17
Routing Setup Issue with Machines Bryan Manufacturing & Supply Chain 5 3rd October 2002 18:04
Work center & calendar setup issue Bryan Manufacturing & Supply Chain 1 28th June 2002 10:51


All times are GMT +2. The time now is 19:52.


©2001-2017 - Baanboard.com - Baanforums.com