Baanboard.com

Go Back   Baanboard.com > Forum > Baan Quick Support: Functional & Technical > Tools Administration & Installation

User login

Frontpage Sponsor

Main

Google search


Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
33%
Installation Wizard into new VRC
39%
Manual into existing VRC
6%
Manual into new VRC
22%
Total votes: 49

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 21st November 2003, 02:28
gavin_wusj gavin_wusj is offline
Senior Member
 
Join Date: Oct 2003
Location: Shanghai,China
Posts: 111
gavin_wusj is on a distinguished road
Baan: LN - DB: oracle - OS: Sun solaris
Reference and project model

HI, dear all
We always use the project model, but the reference model never be used, now I want to know its use,and what does it contrast with project model?
Thanks for ur suggestions!

Gavin
11/21
Reply With Quote
  #2  
Old 21st November 2003, 08:39
shuklan's Avatar
shuklan shuklan is offline
Member
 
Join Date: Aug 2003
Location: New Delhi, India
Posts: 38
shuklan is on a distinguished road
Baan: B4c4, sp10, India Localization - DB: MS SQL Server 2000 - OS: WIndows 2000 Advance Server
Hi Gavin
i have some documentation which says as follows.

The Enterprise Modeler module comprises the following business objects:
A) Master Data
B) Reference Models
C) Project Models
These business objects must be used in a certain order to work according to the concept behind the Enterprise Modeler.
Before any models representing organization typologies (reference models) or specific organizations (project models) can be made, some master data must be entered. First, a version must be defined for which a model is to be created. Based on this model, the desired BAAN IV components will be selected, the parameters will be set, the user dialogs will be created, and the performance indicators will be monitored. Second, the components that are used in the models must be defined as master data. This data includes such components as business functions, business processes, and rules. This master data is placed in a so-called repository, which contains the building blocks for the models that will be created.
Next, the reference models representing the best-practice situation of organizations with a certain organization typology must be created. Each reference model consists of a business function model, an organization model, and a business process model. Each reference model mainly consists of three models, namely, a business function model, an organization model, and a business process model. Respectively, these models describe the business functions in an organization, the (hierarchical) structure of the organization, and the working order of the activities needed to fulfill the business functions. The business function models and business process models of the reference models are built by copying functions and processes from the repository in which these components were predefined in the Master Data business object.Finally, the project models representing the situation of one specific organization can be created. These models are similar to reference models, except for the fact that they are specific to one organization in particular.
In principle, a project model is created based on a reference model, after which the project model can be made organization-specific. In project models, it is also possible to define business function variants representing different ways of accomplishing a business function. For these variants, optimization relationships can be defined, which represent the recommended paths that must be followed when switching from one way of working to a more optimized manner. The business function models and business process models of the project models are built by copying functions and processes from the repository in which these components were predefined. Figure 1-2 shows the relationships between the three business objects of the Enterprise Modeler module. Lines 1 through 3 show the described order. Line 4 shows an option which is used if a newly created project model describes the best-practice situation within a certain organization typology so accurately that the project model can be used as a reference model in the future.
1 Reference models consist of a number of components available in the repository (as specified in the Master Data business object).
2 Project models are often based on reference models.
3 Project models consist of a number of components available in the repository (either newly included or indirectly by means of the reference model).
4 Reference models can be based on project models.

I hope it will put some light on it.
Nishant
Reply With Quote
Sponsored Links
  #3  
Old 21st November 2003, 08:48
gavin_wusj gavin_wusj is offline
Senior Member
 
Join Date: Oct 2003
Location: Shanghai,China
Posts: 111
gavin_wusj is on a distinguished road
Baan: LN - DB: oracle - OS: Sun solaris
Thanks very much for ur help!

Gavin
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
SSA ERP-NL / Baan V6 is it Vaporware ? tjbyfield General Discussion & Chat 18 1st October 2004 10:50
Reference type in product variant mprakash Manufacturing & Supply Chain 3 22nd July 2004 16:56


All times are GMT +2. The time now is 15:48.