Go Back > Forum > Baan Quick Support: Functional & Technical > Manufacturing & Supply Chain

User login

Frontpage Sponsor


Google search

For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
Installation Wizard into new VRC
Manual into existing VRC
Manual into new VRC
Total votes: 39

Baanboard at LinkedIn

Reference Content

Thread Tools Display Modes
Old 10th April 2012, 00:46
mpolnz mpolnz is offline
Junior Member
Join Date: Dec 2009
Posts: 12
mpolnz is on a distinguished road
Baan: V - DB: SQL SERVER - OS: W2K3
Safety Stock and Item Order Planning
Baan: ERP LN 6.1 FP5

Question regarding Item Order Plan and Safety Stock.
Currently, when projected stock drops below safety stock, the item order planning system will plan a receipt for the period in which the safety stock is consumed.
This often leads to planned orders with past due start dates or Reschedule In signals that cannot be achieved because of the supply time.
Such past due start dates cause purchasing to scramble for a requirement that is not urgent and dilutes their attention from true urgent requirements.
Is it possible to configure the system such that when this occurs, the planning system plans a receipt in the period that corresponds to the supply time of the item from the current date and so does not create a planned order with a past due start date?
Reply With Quote
Sponsored Links
Old 18th April 2012, 07:26
quelle's Avatar
quelle quelle is offline
Senior Member
Join Date: Oct 2008
Location: Thailand
Posts: 193
quelle is on a distinguished road
Baan: ERP LN 6.1 - DB: x - OS: x
In FP7 you can set up the time fence in item planning.

If you only thick use time fence selection box, then at least the planned start date and finish date wil use the current date.

Time fence can be set as the same with normal supply time but this is not refer to which supplier.
Reply With Quote

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Handling Unit functionality baazigar Distribution, Transportation & Warehousing 4 19th February 2012 16:54
Generating Cycle Count Order For New Item teddybear Distribution, Transportation & Warehousing 5 14th December 2010 09:24
Is MAUC also applied in Production Receipt amount? quelle Manufacturing & Supply Chain 3 6th January 2010 13:38
Economic Stock already present for the item. keyuser.tdtt Distribution, Transportation & Warehousing 2 8th December 2008 13:28
Allocated stock for deleted order en@frrom Distribution, Transportation & Warehousing 6 26th April 2004 11:58

All times are GMT +2. The time now is 23:55.

©2001-2017 - -