Baanboard.com

Go Back   Baanboard.com > Forum > Baan Quick Support: Functional & Technical > Manufacturing & Supply Chain

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
35%
Installation Wizard into new VRC
42%
Manual into existing VRC
3%
Manual into new VRC
19%
Total votes: 31

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 27th April 2017, 23:13
conwedjpc conwedjpc is offline
Junior Member
 
Join Date: Apr 2017
Posts: 3
conwedjpc is on a distinguished road
Baan: 4c4 erpln 10.2.1 - DB: mssql - OS: unix x86
missing scheduled reciepts in MPS aggregated periods
Baan: Baan IVc4

We have been running a multilevel plan for several years.
using aggregation for multilevel links.
in the last 3 months the scheduled demand on the plan levels above (or below depending on your terminology) lost the scheduled reciepts numbers that have been there for a long time.
the actual planned customer orders and scheduled reciepts remain correct on the actual planned items level.
Does anyone know what I can do to reload those prior period actuals?
I have tried every combination I can think of to reload goods flow numbers although I figure that only happens at the bottom actual production level, and I have tried aggregating back up, but I am not even sure aggregation will impact the scheduled reciepts lines. I am unclear what choices kick off updating goods flow updates in MPS anyway. Seems a bit clearer on ERPLN than on Baan IV.
Reply With Quote
Sponsored Links
  #2  
Old 29th May 2017, 15:15
erplncons erplncons is offline
Member
 
Join Date: Oct 2008
Posts: 86
erplncons is on a distinguished road
Baan: All - DB: All - OS: All
When you run the MPS planning engine do you consider all the planning levels from 1 to the actual actual plan item levels (say 4 or 5 or 10 whatever it could be). Try running regenerative plan
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Need to delete chunk form Informix vineetu1 Operating Systems & Databases 2 24th January 2006 13:14
MPS questions, food manufacturer Michail Manufacturing & Supply Chain 2 27th September 2004 15:05
Questions on Scenarios, Periods, and Dates Mick Andrus Manufacturing & Supply Chain 4 10th January 2004 01:05


All times are GMT +2. The time now is 02:10.


©2001-2017 - Baanboard.com - Baanforums.com