Baanboard.com

Go Back   Baanboard.com > Forum > Baan Quick Support: Functional & Technical > Tools Development

User login

Frontpage Sponsor

Main

Poll
For ERP LN feature pack upgrade, what method of install are you using?
Installation Wizard into existing VRC
35%
Installation Wizard into new VRC
42%
Manual into existing VRC
3%
Manual into new VRC
19%
Total votes: 31

Baanboard at LinkedIn


Reference Content

Reply
 
Thread Tools Display Modes
  #1  
Old 1st December 2016, 08:57
sai krishna sai krishna is offline
Junior Member
 
Join Date: Dec 2016
Posts: 12
sai krishna is on a distinguished road
Baan: 10.04 - DB: baan sql - OS: windows 10
Calendar code of below requirement

Hi to every one,
i want the code for the below requirement

Here i will give the clear example ::
suppose when i select the project in the zoom section below i want to come min date(starting date of a group projects)
max date(last date of a group projects) these two has to come in a calendar section.the min and max dates are in Activity schedule.any one knows could you please provide the code of the above requirement

thank you,
Reply With Quote
Sponsored Links
  #2  
Old 1st December 2016, 14:59
bhushanchanda's Avatar
bhushanchanda bhushanchanda is offline
Guru
 
Join Date: Sep 2012
Location: India
Posts: 2,286
bhushanchanda has a spectacular aura aboutbhushanchanda has a spectacular aura aboutbhushanchanda has a spectacular aura about
Baan: LN FP 1-9, 10.4, a little bit of Baan IV - DB: SQL Server 2008, Oracle - OS: Windows Server 2008 R2, Unix
Hi,

You can use arrays to do it. Say you use 3 arrays for three columns. Now based on the number of days, you can fill the values in these arrays and then print them. Another way is to use 3 different variables and then assign the values to them using the conditions and print them on the report.

Second one being an easier option, you can chose first if you want the columns to appear dynamically rather than being fixed.
__________________
Regards,

Bhushan

Unless you try to do something beyond what you have already mastered, you will never grow!
Reply With Quote
  #3  
Old 2nd December 2016, 06:07
sai krishna sai krishna is offline
Junior Member
 
Join Date: Dec 2016
Posts: 12
sai krishna is on a distinguished road
Baan: 10.04 - DB: baan sql - OS: windows 10
Thank you sir for asset me.
But i am a fresher can you please send me the sample code of the my requirement.Do you have any Material regarding the Baan coding .
thank you,
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Default Calendar for plan code %s not present dmanickln Manufacturing & Supply Chain 1 30th April 2016 07:25
NEW: vbcode CODE extensions patvdv About Baanboard.com 3 13th March 2003 11:19
CODE: A calendar maintenance session (Calendar1.zip) lsatenstein Code & Utilities 0 3rd October 2002 14:44


All times are GMT +2. The time now is 00:30.


©2001-2017 - Baanboard.com - Baanforums.com